1. Introduction
1.1 Purpose
The purpose of this manual is to explain the configuration and behavior of experiment scheduling, including trigger-based activation, relative scheduling, end date settings, and individual workflow configuration per participant.
1.2 Scope
This manual covers the following aspects:
-
Behavior and configuration of trigger-based scheduling ("First Login", "Start Date" and "Experiment Completed")
-
Individual participant scheduling vs. project-level
-
Setting and calculating schedule end dates and occurrences
-
Recurring schedules (including relative frequency options)
-
Display behavior of scheduled tasks in the app
-
Time zone considerations
2. Scheduling configuration
2.1 Trigger-based Scheduling
The system supports trigger-based activation of experiment schedules. Supported triggers are:
-
First Login:
-
The schedule is activated either immediately upon the user's first login or after a configurable delay. The delay can be set in hours, days, or months from the moment of first login.
-
The system shall provide an option to set the specific time at which the experiment must be triggered.
-
If the patient logs in after the scheduled trigger time (e.g., logs in at 11:00 AM when the experiment was set for 8:00 AM), the task shall be scheduled for the next valid occurrence of that time (e.g., 8:00 AM the following day).
-
The availability duration of the task (e.g., 1 hour, 3 weeks) shall begin from the actual trigger time, not from the originally scheduled time if it has already passed.
-
-
Experiment Completed:
-
The schedule is activated when the user successfully completes a selected experiment. A delay can also be configured in hours, days, or months after the experiment completion.
-
The system shall provide an option to set the specific time at which the experiment must be triggered.
-
If the patient completes the experiment after the scheduled trigger time (e.g., completed at 11:00 AM when the experiment was set for 8:00 AM), the task shall be scheduled for the next valid occurrence of that time (e.g., 8:00 AM the following day).
-
The availability duration of the task (e.g., 1 hour, 3 weeks) shall begin from the actual trigger time, not from the originally scheduled time if it has already passed.
-
Conditional Scheduling can be configured within Experiment Completed trigger. For example, a workflow can be activated only when a participant achieves a defined condition in a previous experiment, such as a minimum number of correct answers. Example script for evaluation:
-
function evaluate(user, results) {
return results[0].correct > 15
}
-
-
-
Start Date (manual selection):
The schedule is activated on a fixed date manually selected by the user.
These triggers must be stored in the database and retrievable via API.
2.2 End Date configuration
When configuring a schedule, users can select how and when the schedule ends. Options include:
-
No end date:
Schedule remains active indefinitely as long as the project/sub-org/patient exists. -
Set end date:
A calendar appears to let the user select a specific date. The schedule is active until that date. -
Amount of occurrences:
A text field appears to define how many times the task should occur. The effective end date is calculated based on this input. -
Behavior:
-
Tasks are scheduled only within the active period.
-
Tasks are not shown in the app after the end date.
-
2.3 Individual participant Scheduling
Participants can have workflows tailored specifically to them:
-
Default behavior:
New participant workflows are prefilled from the project-level configuration. -
Override capability:
Individual workflows overwrite project-level defaults (for the individual participant). -
Visibility:
When an individual schedule is applied, it is displayed in the app accordingly.
2.4 Recurring Scheduling options
When setting a recurring schedule, the following frequency options are available via dropdown:
-
Daily
-
Weekly
-
Monthly
-
Relative
Relative Scheduling:
When "Relative" is selected, an additional input appears:
every [X] hour(s)/day(s)/week(s)/month(s)/year(s)
-
The first task appears in the Planned Tasks section as per schedule.
-
Tasks appear in the Open Tasks section only during the active duration defined in the workflow.
2.5 Task visibility in the app
-
Planned tasks:
-
Displays the next upcoming task (first scheduled task in the future).
-
-
Open tasks:
-
Displays only active tasks within the configured active duration (taking into account how the availability has been configured).
-
2.6 Time zone considerations
-
Task scheduling respects the user’s individual time zone.
-
Future tasks are scheduled using the time zone in effect at that future date.
2.7 Project and patient workflows
-
A project can have multiple workflows, each linked to a specific experiment.
-
When adding a patient, multiple workflows can also be assigned.
-
Workflows can be deleted or modified as needed.